Sabung Ayam Slot Zeus Slot Mahjong Slot Gacor Sabung Ayam Slot Gacor Sabung Ayam Slot Gacor Mix Parlay Sabung Ayam Casino Online Slot Online Slot Kakek Zeus Kakek Zeus Slot Mahjong Slot Mahjong Casino Online Sabung Ayam Slot Mahjong Slot Gacor Slot Gacor Slot Thailand Agen SBOBET/a> Agen SBOBET/a> Prediksi Parlay Bola Sabung Ayam Slot Mahjong Kakek Zeus Slot Online Sabung Ayam Slot Online Casino Online Judi Online Sabung Ayam Judi Online Sabung Ayam slot server thailand akun pro thailand Slot Gacor slot thailand slot dana sabung ayam casino online mahjong ways MPO Slot sv388 Slot Zeus GA28 sabung ayam online maxwin slot zeus slot mahjong ways 2 sv388 MPO slot slot pulsa tanpa potongan Mahjong Ways slot zeus slot mahjong ways 2 slot kamboja slot thailand sv388 sv388 slot gacor koi gate mahjong ways 3 lucky neko wild bandito sbobet sv388 slot gacor mahjong ways sv388 slot
sabung ayam online
akun pro thailand
slot thailand
slot777
sv388
casino online
akun pro kamboja
slot gacor
slot gacor
akun pro jepang
sweet bonanza candyland
casino online
slot gacor
slot gacor
sabung ayam online
sabung ayam online
zeus slot
casino online
Zeus Slot
Wahanabet
Scatter Hitam
casino online
Zeus Slot
slot77
slot gacor
indomax88
sabung ayam online
sabung ayam online
zeus slot
juara303
sabung ayam online
casino online
sbobet
slot thailand
sv388
akun pro jepang
Mahjong Ways 2
Akun Pro Jepang
Casino Online
Toto Slot
Slot Zeus
Casino Online
Slot Gacor Maxwin
Sbobet
Toto Slot
Announcements – Copperbelt Development Foundation Limited https://cdfl.co.zm Improving Lives Thu, 20 Jun 2019 06:32:23 +0000 en-US hourly 1 https://wordpress.org/?v=6.2.5 Advert For Contractors /Suppliers https://cdfl.co.zm/advert-for-contractors-suppliers/ https://cdfl.co.zm/advert-for-contractors-suppliers/#comments Mon, 28 Aug 2017 07:37:19 +0000 https://185.17.252.60/cdfl/cdfl-website-draft2/?p=2026
Icon

Advert for Contractor Registration 216.42 KB 77 downloads

...
]]>
https://cdfl.co.zm/advert-for-contractors-suppliers/feed/ 1
CDFL Project Application Template https://cdfl.co.zm/cdfl-project-application-template/ https://cdfl.co.zm/cdfl-project-application-template/#respond Mon, 28 Aug 2017 07:36:23 +0000 https://185.17.252.60/cdfl/cdfl-website-draft2/?p=2024
Icon

Advert for Contractor Registration 216.42 KB 77 downloads

...
Icon

CDFL Pre-qualification Tender 635.43 KB 49 downloads

...
]]>
https://cdfl.co.zm/cdfl-project-application-template/feed/ 0
Mopani, CEC and CDFL collaborate to repair a community bridge in ZAMTAN https://cdfl.co.zm/mopani-cec-and-cdfl-collaborate-to-repair-a-community-bridge-in-zamtan/ https://cdfl.co.zm/mopani-cec-and-cdfl-collaborate-to-repair-a-community-bridge-in-zamtan/#respond Wed, 08 Mar 2017 11:42:42 +0000 https://185.17.252.60/cdfl/cdfl-website-draft2/?p=1162

Damaged community bridge in ZAMTAN

Mopani Copper Mines Plc (Mopani) has partnered with the Copperbelt Energy Corporation Plc (CEC) and Copperbelt Development Foundation Limited (CDFL) to repair a bridge across Kitwe’s Mwekera stream, which was washed away during the 2015/2016 rainy season.

The bridge is an essential piece of infrastructure for the predominantly small farming community in the area as it is their main link to the central business district. The repair works at the bridge are estimated at a total cost of K1.7 million.

The three companies have since signed a memorandum of understanding (MoU) that will see Mopani contribute 66.1 percent of the total budget with CEC and CDFL meeting 9.7 percent and 24.2 percent, respectively.

The repair works on the bridge include fabricating frames for the bridge structure, casting concrete works for the foundations and installing handrails on either side of the bridge.

Mopani’s contribution, valued at K1.1million includes the piling, civil and mechanical works as well as provision of equipment and technical services such as designing, drawings, bills of quantities and supervision; while CEC’s contribution of K160,000.00 and CDFL’s K400,000.00 will largely go towards civil and mechanical works.

The Mwekera Bridge is located in Zamtan area off the Kitwe-Ndola highway, about 700 metres from the Kitwe police check-point and is accessed by more than 5,000 residents of Kitwe East from Kakolo, Mufuchani and Kamfinsa communities.

According to Alinani Simumba, a resident and frequent user of the bridge, the absence of the bridge in the area since the beginning of 2016 has affected the entire local population which includes small scale farmers, school children, a faith-based orphanage/school run by the Baptist Church, and Umozi Home-Based Care who work with people living with HIV.

“The damaged bridge has had a negative impact on the community not only in terms of access to schools, medical services and basic needs but also the livelihoods and safety of the community; more so in the likely event of a life-threatening emergency,” explained Mr. Simumba.

He disclosed that the residents had sought help from various organisations and government departments since February 2016 but nothing came forth until the three companies came on board.

Under the MoU, the three companies have agreed to pool their resources and efforts to accomplish the project’s objective of building a bridge over the Mwekera stream.

The MoU states in part that: “Each of the parties possesses certain assets, abilities, specific expertise or other valuable tangible or intangible assets which it is prepared to place at the disposal of the joint project.”

The collaboration is testimony to how the three companies value relationships with the communities in their areas of operation as well as a demonstration of their corporate social responsibility and commendable ability to come together to serve a greater good.

]]>
https://cdfl.co.zm/mopani-cec-and-cdfl-collaborate-to-repair-a-community-bridge-in-zamtan/feed/ 0