Moobe Community School

Construction of 2No.1×3 classroom blocks, 2No. 1 x 4 block of flats, 3No. 3 bedrooms houses, Ventilated Improved Pit-latrines, education material (Text Books for Grade 1 – 9 ), procurement of School uniforms, shoes and sports-ware, sinking of a borehole with hand pump, procurement of desks and office furniture.

Chintimfu Community School

Construction of  2No, 1×3 classroom blocks, 2No. 1×4 blocks of flats. Construction of 3No. 3 bed roomed houses  sinking of borehole, erection of overhead water tank of 10,000 liters capacity and procurement of education materials, desks, office furniture, sports materials and accessories and power connections to the school.

Fipashi Primary School

Construction of a 1No. 1×3 classroom block,a 1 NO x 4 block of flats, drilling of borehole, installation of elevated water tank of 10,000 liters capacity, ICT equipment, Office furniture and connecting the school to the school,  About 500 pupils and 20 teachers benefited.

 

Kabwata Primary School

Construction of a 1No. 1×4 block of flats,  sinking of borehole and installation an elevated water tank (5,000 liters capacity). connected power to the flats.

Lumanto Primary School

Construction of’  1NO  1 x 3 dormitory for boys and 1NO ablution block,sinking of borehole and installation of an elevated water tank (5,000 liters capacity), power connection to the school. About 200 pupils and 7 teachers benefited.

Dagama School

Construction of a 1No. 1×3 dormitory, procurement of 40 beds and 40 lockers, physio equipment: Infra-red lamp, Hydro collator Unit, Treadmill, Wheelchairs, Elbow crutches, walking frames, Underarm clutches and Glide cycles.

Chifulube Primary School

Construction of 1No.1×3 classroom block and 1No. 1 x 4 block of flats, solar power electrification and sinking of borehole and installation of hand pump. About 1,200 pupils and 8 teachers benefited.